FeaturedNews

Vertical Aerospace Completes Construction of Bristol Powertrain Facility

Ver­ti­cal Aero­space has com­plet­ed con­struc­tion of a new 30,000-square-foot Pow­er­train Cen­tre in Bris­tol, UK, which will sup­port devel­op­ment, test­ing and pro­duc­tion of bat­ter­ies and propul­sion sys­tems for its elec­tric and hybrid-elec­tric air­craft pro­grammes.

The facil­i­ty is locat­ed along­side the company’s exist­ing Ver­ti­cal Ener­gy Cen­tre (VEC) and is intend­ed to sup­port the devel­op­ment of cer­ti­fi­ca­tion air­craft and ear­ly com­mer­cial pro­duc­tion of its Valo elec­tric ver­ti­cal take-off and land­ing (eVTOL) air­craft. Equip­ment instal­la­tion and engi­neer­ing work are the next steps, with oper­a­tions expect­ed to ramp up from 2027.

Ver­ti­cal said the new cen­tre is expect­ed to increase its bat­tery-pro­duc­tion capac­i­ty by up to three times over time. The facil­i­ty will bring togeth­er work on bat­ter­ies, pow­er elec­tron­ics and propul­sion sys­tems, allow­ing the com­pa­ny to car­ry out more of its pow­er­train engi­neer­ing and sys­tems inte­gra­tion in-house.

The company’s pow­er­train activ­i­ties sup­port both its all-elec­tric Valo pro­gramme and a sep­a­rate hybrid-elec­tric devel­op­ment pro­gramme. Ver­ti­cal is work­ing with sup­pli­ers includ­ing Hon­ey­well, Syen­sqo and Sonaca on oth­er air­craft sys­tems and com­po­nents.

The new facil­i­ty builds on the 15,000-square-foot VEC, which opened in 2023. That site has been respon­si­ble for design­ing, test­ing and pro­duc­ing bat­ter­ies used in Vertical’s pilot­ed flight test­ing since 2024. Ear­li­er in 2026, the com­pa­ny pro­duced its first all-elec­tric Valo bat­tery on an upgrad­ed assem­bly line and began test­ing its next-gen­er­a­tion hybrid-elec­tric propul­sion sys­tem on a ded­i­cat­ed eval­u­a­tion rig at Cotswold Air­port.

Ver­ti­cal also sees the facil­i­ty as sup­port­ing longer-term rev­enue from bat­tery ser­vic­ing and replace­ment. The com­pa­ny esti­mates that an air­craft could require approx­i­mate­ly 20 bat­tery packs over its oper­a­tional life, although this fig­ure will depend on oper­at­ing con­di­tions and bat­tery per­for­mance. The cen­tre is also intend­ed to devel­op bat­tery recy­cling, reuse and reman­u­fac­tur­ing capa­bil­i­ties for poten­tial appli­ca­tions beyond its own air­craft.
The Bris­tol invest­ment forms part of a wider pro­gramme to estab­lish the infra­struc­ture need­ed for cer­ti­fi­ca­tion and ear­ly pro­duc­tion. Ver­ti­cal opened an Air­craft Assem­bly Cen­tre at Cotswold Air­port in Sep­tem­ber and expects to announce the loca­tion of its first full-scale air­craft pro­duc­tion site before the end of 2026.

author avatar
Thomas Sleightholm
Thomas is a con­tent writer for eVTOL Insights, cov­er­ing all aspects of the glob­al Advanced Air Mobil­i­ty ecosys­tem. Got a sto­ry for him? Please send an email to editorial@evtolinsights.com
Avatar photo

Thomas Sleightholm

Thomas is a content writer for eVTOL Insights, covering all aspects of the global Advanced Air Mobility ecosystem. Got a story for him? Please send an email to editorial@evtolinsights.com

eVTOL Insights is part of the Industry Insights Group. Registered in the UK. Company No: 14395769